Stick with what works !
GO
 
 
Site Information
►  Contact Us
►  Our Staff
►  Sitemap
STAUF USA, LLC.
11121 Hwy 70
Suite 102
Arlington, TN 38002

Toll Free: 1-866-GLUE USA
Phone: +1-901-820-0007
Fax: +1-901-820-0101
Email: info@staufusa.com
 
© 2011 STAUF USA, LLC.
 
Products  ►  Product Listing STAUF PDF version Print

TECHNICAL DATA SHEET

B350 PU Binder (Base)

PU Binder for Base Layers

Special features
  • Create base layers for running tracks
  • Create shock pads for turf or tennis courts
  • Fast setting
  • Solvent free

Product Description
B350 is a one-component, solvent-free moisture-cured urethane binder for mixing with rubber granulates to create base layers for running tracks, tennis courts, and shock pads.
Pre-Installation Checklist
A successful installation requires proper preparation of the subfloor. Read and understand all applicable guidelines and technical data sheets before beginning installation. Follow industry standards and flooring manufacturers' recommendations for subfloor preparation, design, layout, and application of flooring materials. The backing of all flooring material must be solid and sound, and free of anti-adherents.
Sub Floor Examination
Prior to installation, the subfloor must be checked according to national standards. It must be solid and sound, level, free of indentations, and resistant to pressure and tension.
Mixing of Components
For creating top layers, use 18-22% binder, for base layers, use 15-18% binder. The correct mixing ratio depends on the actual application, dust content, and particle size of the rubber being used.
Installation Procedure
Mix binder and rubber in a mechanical mixer, then spread on ground.
Limitations
When using other than STAUF products in conjunction with STAUF primers, sealers, leveling compounds, or adhesives, STAUF denies any and all responsibility for any ensuing problems and/or damages without prior written authorization from STAUF.
Do not install during rain.
In case of an accident, injury, spill, or exposure, see SDS for information. Consult the Technical Data Sheet at www.staufusa.com for updated information.
General Features
  • Nonflammable
  • High solids content
  • High strength moisture-cured urethane
Installation Features
  • Cleans with acetone
Long Term Features
  • Resistant against aging
  • Remains elastic
Approved Subfloors
  • Concrete Slabs
  • Asphalt
Approved Primers
  • STAUF AQP-200 Eco-Prime
Cure Time until Normal Traffic
  • Between 12 and 18 hours, completely hardened after 7 days
Clean-Up
  • Use acetone while wet
Temperature Range during Installation
  • 50-90F (10-32C)
Relative Humidity Range during Installation
  • 30% - 80%
Packaging Size
  • 264 gal. Tote
Weight [lbs./gal.]
  • 9.0
Color
  • Beige
Storage
  • Dry
Shelf Life
  • 6 Months in original, unopened container
Revision: 2022-04-18 13:48:37