Technical Data Sheet (TDS)

CCI-600

Interior Epoxy Coating Base Coat

Special features

  • special formulation for thicker coats
  • clear hardener
  • can be tinted

Product Description
STAUF CCI 600 is a two component, 100 % solid epoxy resin base coat for professional flooring installation over indoor floors requiring industrial grade coatings. CCI 600 can be mixed and modified with tints for coloring, flakes for decorative flooring. Once cured, floor coating is safely cleaned by using any number of methods including high pressure, ammonia, bleach, solvents and steam washing.
Pre-Installation Checklist
A successful installation requires proper preparation of the sub floor. Read and understand all applicable guidelines and technical data sheets before installation. Follow industry standards and flooring manufacturer's recommendations for sub floor moisture content, design, layout and application of flooring materials. All slab constructions must meet the specific requirements of the floor covering to be installed.
Sub Floor Examination
Prior to installation, the sub floor must be checked according to applicable installation guidelines. It must be solid and sound, clean, free of chaps and anti-adherents, as well as resistant to pressure and tension. Check for missing or compromised vapor barriers and hydrostatic pressure. Perform RH or CaCl moisture tests following ASTM standards. Results of 99% RH or 25# CaCl could indicate that there is a higher moisture content in the slab than what tests can measure and there might be hydrostatic pressure and/or a compromised or missing vapor barrier.
Sub Floor Preparation
The condition of the sub floor will determine which type of mechanical treatment is required (e.g. wire brushing, sanding, grinding or shot blasting). Dust, paint, curing compounds, sealers, residual adhesives or other surface pollutants MUST be removed by suitable means. Extent of sub floor preparation can only be determined at the site by the installer. Clean the surface with an industrial vacuum cleaner, tack or damp mop floor before application. Do not use sweeping compounds as most will contain oil or wax which will act as an anti-adherent and prevent primers, sealers, leveling compounds, coatings and/or adhesives from bonding to the concrete. Cracks and gaps must be treated prior to application of primers, sealers, leveling compounds, coatings and/or adhesives (for details see Technical Information #19 @ www.staufusa.com)
Mixing of Components
Lid contains hardener. Pierce all the way through plastic disc in center of lid and the bottom of the lid using a long screwdriver or similar tool. Let the hardener flow into the lower part of the bucket for one minute. All of the hardener must drain into the pail before mixing parts A&B. Open ring, remove the lid and mix both components with mixing paddle for at least 3 minutes. Use an electric drill with less than 300 rpm until an even color is reached. Avoid air entrapment by mixing slowly and using an appropriate mixing paddle. Make sure to mix along wall and bottom-part of the container as well. Temperature of both components should be at least 50 °F before mixing.
Installation Procedure
Mix pail according to mixing instructions. Empty pail onto floor immediately after mixing to prevent product from heating up and drying in the pail. Apply coating undiluted with approved applicator. Make sure coating is spread evenly and up to the perimeters. The spread rate is critical for a successful installation. Do not exceed the minimum or maximum coverage.
Limitations
When using other than STAUF products in conjunction with STAUF primers, sealers, leveling compounds, or adhesives, STAUF denies any and all responsibility for any ensuing problems and/or damages without prior written authorization from STAUF.
Do not dilute primer/sealer or mix with other products.
In case of accident, injury, spill or exposure, see SDS sheet for information. Consult technical data sheet at www.staufusa.com for updated information.
Sub floor temperatures between 32 and 50 °F (0 and 10 °C) will dramatically increase drying time up to 24 hours. Never install product when sub floor temperature is below freezing or if condensation could occur on the sub floor within 24 hours after application.
The foregoing representations are based on the results of our most current product and material testing within a controlled environment and are of a non-obligatory advisory nature only. As such, they do not constitute an express or implied warranty of any kind including the Warranty of Merchantability and/or Fitness for a Particular Purpose. Because we have no control over the actual quality of workmanship, materials used and worksite conditions, STAUF USA, LLC. will in no event be liable for any incidental and/or consequential damages. herefore, we strongly recommend that prior on-site testing be conducted to refer to and study the suitability of the product for the intended purpose. With the release of this technical information sheet all its prior versions become invalid. For warranty and warranty disclaimer information please see our Limited Lifetime Warranty @ www.staufusa.com
General Features
  • contains no water
  • contains no chlorinated solvents
  • contains no solvents
  • contains no VOC (calc. per CA Rule 1168)
  • high solids content
  • ozone friendly
  • Freeze/thaw stable
  • contains no isocyanates
Installation Features
  • low odor
  • high spread rate
  • excellent penetration of sub floor
  • higher temp & RH will shorten drying time
  • observe pot life during installation
Long Term Features
  • resistant against aging
  • suitable for radiant heat systems
VOC (Rule 1168 calc.) [g/L]
  • 84
Viscosity [cps]
  • A:1500-2400 B:350-450 Mix:1200
Abrasion Resistence (CS-17, 1000g, 1000cycles) [mg]
  • 70
Dry Film Thickness [mil]
  • 32
Bond Strength [psi]
  • > 300
Compression Strength [psi] EN ISO 604
  • 15,000
E-Module [psi] EN ISO 604
  • 230,000
Flexural strength [psi] EN ISO 178
  • 4,000
Tensile Strength [psi] EN ISO 527
  • 2,900
Elongation at Break [%]
  • 2.3
Shore D Hardness (ISO 7619)
  • >70
Approved Sub Floors
  • Concrete Slabs
  • Stone, Terrazzo
  • Radiant Heated Sub Floors
  • Drywall
  • Plaster
  • Stained Concretes (well bonded)
  • Cured and primed cementitious levelers
Approved Trowels and Spread Rate
  • XBL11 (1/8" x 5/32"): up to 50 SF/gal.
Drying Time
  • between 12 and 18 hours, completely hardened after 7 days
Temperature Range during Installation
  • 50-90F
Relative Humidity Range during Installation
  • 30% - 80%
Packing Size
  • 2 gal. Metal Combo Pail (A+B)
Density [lbs./gal.]
  • A:13.6 B: 8.8 Mix: 12.4
Color
  • White
Color Hardener
  • clear
Mixing Ratio
  • 4 parts A + 1 part B by weight
Pot Life
  • approx. 25 min @ 70 F (21 C)
pH value of concrete
  • resistent up to 14
Storage
  • above 14 F
Shelf Life
  • 24 Months in original, unopened container
Transportation
  • UN 2735 Polyamines DOT Class 8 Corrosive
Revision: 2017-07-26 17:15:22